2 installation, 1 setting up the instrument, 1 packaging – Metrohm 812 Valve Unit User Manual
Page 10: 2 check, 3 location, 4 arrangement of the instruments
2.1 Setting up the instrument
812 Valve Unit
7
2 Installation
2.1
Setting up the instrument
2.1.1 Packaging
The 812 Valve Unit is supplied together with the separately packed ac-
cessories in special packagings containing shock-absorbing foam lin-
ings designed to provide excellent protection. The instrument itself is
packed in an evacuated polyethylene bag to prevent the ingress of
dust. Please store all these special packagings as only they assure
transport of the instrument free from damage.
2.1.2 Check
After receipt, immediately check whether the shipment is complete and
has arrived without damage (compare with delivery note and list of ac-
cessories in section 4.2). In the case of transport damage, see instruc-
tions in section 4.4.1 "Warranty".
2.1.3 Location
Position the instrument in the laboratory at a location convenient for op-
eration, free from vibrations and protected against a corrosive atmos-
phere and contamination by chemicals.
2.1.4
Arrangement of the instruments
The 812 Valve Unit can be piled up together with other IC instruments
(e.g. 732, 733, 709).