4 setting up the instrument, 1 packaging, 2 checks – Metrohm 850 Professiona IC Cation Prep 1 User Manual

Page 25: 3 location, Setting up the instrument, Packaging, Checks, Location

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

2 Installation

850 Professional IC –Cation – Prep 1

■■■■■■■■

15

3

High pressure pump
See Chapter 2.10.

4

Purge valve
See Chapter 2.10.1.

5

Inline filter
See Chapter 2.11.

6

Pulsation damper
See Chapter 2.12.

7

Injection valve
See Chapter 2.15.

8

Separation column
See Chapter 2.20.
When a guard column (see Chapter 2.19,
page 56)
is used, it is installed between
injection valve and separation column.

9

Detector
See Chapter 2.17.

10 Eluent output

Connection to the waste container.

11 Sample input

Connection to the sample vessel (single ves-
sel or sample changer).

12 Peristaltic pump

Pumps the sample. See Chapter 2.14.

13 Ultrafiltration cell

Is not included in the scope of delivery of
the 2.850.1030. Can be ordered as optional
accessories (as individual cell or with equip-
ment).

14 Sample output

15 Sample output

16 Sample degasser

See Chapter 2.13. Use optional.

2.4

Setting up the instrument

2.4.1

Packaging

The instrument is supplied in highly protective special packaging together
with the separately packed accessories. Keep this packaging, as only this
ensures safe transportation of the instrument.

2.4.2

Checks

Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.

2.4.3

Location

The instrument has been developed for operation indoors and may not be
used in explosive environments.

Place the instrument in a location of the laboratory which is suitable for
operation, free of vibrations, protected from corrosive atmosphere, and
contamination by chemicals.

The instrument should be protected against excessive temperature fluctu-
ations and direct sunlight.

Advertising