3.0 Installation and Commissioning

Prior to use for the first time, the supplied desiccant pouch will need to be installed. Refer
to section 9.2

Replacing or Installing the Desiccant Pouch.


3.1 Mounting & Site Selection
The instrument is designed for wall mounting. For rail mounting, contact HF scientific.
Choose a location that is easily accessible for operation and service. Ensure that the front
display rests at eye level. Please note that the enclosure has tool access door, allow ample
room for this door to fully open. The overall mounting dimensions of the instrument are
shown in Figure 4. The recommended mounting screws are M6 (¼”) for the instrument
enclosure.

470,0 [18.50 in]

5

47,

6 [2

1.

56

in]

(4X)

n10,00 [n.393 in] THRU

332,2 [13.08

in]

50

8,0

[2

0

.0

0

i

n

]

508,0 [20.00 in]

45,7 [

1

.80 in]

25,4 [1.00 in]

45,7 [

1

.80 in]

25,4 [1.00 in]

OUTLET

(DRAIN)

INLET

18,3 [0.72 in]

19,0 [0.75 in]

58

5,7

[2

3.0

6

i

n

]

36,5 [1.44 in]

NOTE: ALL DIMENSIONS ARE IN
MILLIMETERS, INCH DIMENSIONS ARE IN
BRACKETS.

Figure 4: Overall Mounting Dimensions of the Instrument

For faster response the instrument should be mounted as close as possible to the sampling
point (within 2-3 meters (6-10 ft) of the sampling point).

AccUView Wastewater (1/09)