MODEL 110E PUMP OPERATION / MAINTENANCE MANUAL

PAGE 3

1

INSTALLATION

1.1 UNPACKING

After unpacking, the pump should be checked for any damage that may have
occurred during shipment. Damage should be reported to the carrier
immediately. The following items should be contained within the shipping
container:

Qty

Item

Description

1

110E

Model 110E Pump

1

M110E

Operation/Maintenance Manual

1.2 TIE BOLT TORQUE

The tie bolts on the pump are tightened before leaving the factory. However,
relaxation may occur due to handling, material creep, or other unforeseen
events. Trebor recommends that all eight tie bolts be re-tightened upon pump
install. The following procedure should be used.

1. Remove black tie bolt caps (Item 22 in 4.4 Parts Illustration) from both

sides of all 8 tie bolts.

2. Apply 32 in-lbs. of torque to each slave side bolt while holding the master

side bolt stationary. A star-pattern is advised.

a. The master side is the left side of the pump if you are looking at

the fluid ports.

3. Replace tie bolt caps.

1.3 UTILITIES / HOOK-UP FOR 110E PUMP

The pump is mounted using four 1/4” bolts. It is recommended that the pump be
mounted not more than 15

from level to maintain its self-priming and pumping

efficiency.

NOTE: New pumps may contain residual moisture from their final DI water test.

Air Inlet:

1/4” FNPT (3/8” Dia. [8mm] supply tube minimum).

Fluid Ports:

1/2” FNPT - additional adaptor port options available.
Inlet/Outlet adaptor fluid fittings and Surge Suppressor require
torqueing during pump installation. See Section 2 for hook- up
diagram and torque values