0 installation and wiring, 1 equipment handling, 1 initial inspection – Monarch Instrument DC6000 User Manual

Page 21: 2 unpacking procedure, 3 detected damage, 4 equipment return, 5 storage, Installation and wiring, Equipment handling, Initial inspection

Advertising
background image

Section 3

– Installation

I.

Page 13

1/06/2012 REV 1.10.2

3.0 INSTALLATION AND WIRING


This section provides information and procedures on installing and wiring the recorder. Included are handling
procedures, installation and wiring specifications, and instructions for both standard and optional equipment.

3.1 Equipment Handling

3.1.1 Initial Inspection

Exercise care when unpacking the instrument from the shipping carton. The instrument is packed in a
shockproof foam retainer to prevent damage during normal transit. If damage to the shipping carton is
evident, ask the carrier’s representative to be present when the instrument is unpacked.

3.1.2 Unpacking Procedure

To unpack your recorder, first remove the foam retainer and instrument from the shipping carton. Then,
carefully remove the instrument from the foam retainer.

3.1.3 Detected Damage

If damage is detected after unpacking the instrument, re-pack the instrument and return it to the factory as
described in the following section.

3.1.4 Equipment Return

Before returning a damaged or malfunctioning instrument to the factory for repairs, contact the sales
organization from which you purchased the instrument. A Return Merchandise Authorization number must be
obtained from the factory before returning an instrument for any reason.

3.1.5 Storage

For prolonged storage before installation, re-pack the recorder in the shipping container. Cushion the
recorder with foam molding or an equivalent and store in a cool, dry area. It is not recommended to store the
recorder for more than one year. If longer storage time is required, contact the factory for additional storage
information.

Advertising