Connect sequence valve, Sequence valve port assignments, Connect supply hoses at valve – Great Plains YP925TD Assembly Instructions User Manual

Page 11: Connect cylinder hoses at valve, S71 s

Advertising
background image

Great Plains Mfg., Inc.

Front

Appendix

Installation Instructions

11

2012-22-03

Front

Appendix

113-870M

Connect Sequence Valve

Sequence Valve Port Assignments

Connect Supply Hoses at Valve

42. Remove any caps from the two supply ports

(stamped “1” and “2” on the valve body). Remove
any plugs from one FJIC end of each supply
hose

. Connect the FJIC hoses ends to MJIC

ports 1 and 2. Do not use pipe sealant. See page 20
for torque specification.

Connect Cylinder Hoses at Valve

43. Remove any caps from the four rear ports (stamped

“C1” through “R2” on the valve body). Remove any
plugs from one FJIC end of each marked cylinder
hose. Connect the FJIC hose ends marked C1
through R2 to MJIC valve ports stamped C1 through
R2. Do not use pipe sealant.

Port Stamp

Function

1

Supply

a

a Either port 1 or port 2 may be connected to the Extend or

Retract side of a tractor remote, as long as the other port is
connected to the Retract or Extend port of that same remote.

2

Supply

a

C1

Left Cylinder Rod End

C2

Right Cylinder Rod End

R1

Left Cylinder Base End

R2

Right Cylinder Base End

Note: The port stampings “C” and “R” are arbitrary.

In particular, “R” does not mean rod or retract.

Figure 13

Connect Valve Hoses

31981

s

71

s

S

Advertising