Install second stage arms, Is secured at step 97 – Great Plains YP925TD Assembly Instructions User Manual

Page 17

Advertising
background image

Great Plains Mfg., Inc.

Front

Appendix

Installation Instructions

17

2012-22-03

Front

Appendix

113-870M

Install Second Stage Arms

If the second stage arms are already installed, continue
at “Fertilizer Shim”.

Refer to Figure 22
94. Select one new of:

113-449H 6 ROW 2ND STAGE ARM WMNT

113-450H 8 ROW 2ND STAGE ARM WMNT

113-835H 4 ROW 2ND STAGE ARM WMNT

Note that the arm stage has a pivot

and a shear

tab weldment

.

95. Select four sets new:

802-042C HHCS 1/2-13X3 3/4 GR5

803-019C NUT LOCK 1/2-13 PLT

These fasteners may be loosely installed in the
second stage mount weldment

. If so, remove

and save them.

96. Slide the arm stage

into the second stage mount

weldment

. Orient the arm

with the pivot

to

planter rear, and the shear tab

to planter front.

Secure it with one bolt

and lock nut

through

the rear mount weldment hole nearest the weldment
pivot.

97. Select one set new (shear bolt):

802-295C HHCS 5/16-18X1 1/2 GR2

803-011C NUT LOCK 5/16-18 PLT

These fasteners may already be loosely installed in
the mount pin

, or in the arm shear tab

. If so,

remove and save them.

98. Rotate the mount pin

into face-to-face alignment

with the shear tab

. Secure with shear bolt

and

lock nut

.

99. If the planter has a fertilizer system, you can also

select one new:

113-551D MARKER SHIM

and install it now instead of at step 105. See
Fertilizer Shim” f
or installation details.

100. Install three more bolts

and lock nuts

through

the remaining mount weldment holes. Tighten to
snug, and not to Grade 5 torque spec. The arm
must be free to swing if the shear bolt

fails in the

field.

101. Repeat step 94 through step 100 for the other arm.

Figure 22

Second Stage Arm

29872

39

55

60

43

3

2

38

58

57

43

2

3

55
60

38

43

38

43

2

3

55

60

57
58

39

3

39

3

57

58

44

55

60

57

Advertising