Machine adjustments, Pre-leveling of machine, Front to rear leveling – Great Plains SS1700 Operator Manual User Manual

Page 20: Auto reset shank adjustment

Advertising
background image

16

SS1300 & SS1700

Table of Contents

Index

Great Plains Manufacturing, Inc.

596-086M

Table of Contents

Index

06/14/2012

Machine Adjustments

Pre-Leveling of Machine

Front to Rear Leveling
32. Pre-leveling of machine may be done on a level floor.

Lower the machine down until the shank tips are just
above the floor.

33. Adjust the 3 point top link until the front and rear points

are level.

Auto Reset Shank Adjustment

Refer to Figure 11

34. The dual spring package should be preloaded so both

top and bottom springs are loaded evenly and measure
23.8” from end of coil to end of coil.

Spring pack is pre-loaded at factory and should not be disassem-
bled in the field. You could be severely injured or killed by instant
release of stored energy.

Figure 11

Auto Reset Shanks

24464

Down Stop

(not visible)

Advertising
This manual is related to the following products: