Amico Condor Adjustable Height Channel User Manual

Page 15

Advertising
background image

Cable Requirement for CPU Mounting on Top

Cable length minimum: 10 feet (304.8 cm), maximum number of cables: 5

Cable Routing Procedure

NOTE:

All accessories should be mounted and properly positioned before cable management procedures.

1. Release Condor Lock and bring Condor mounting channel to top most position and re-lock.

2. Open Condor left cover (

Figure 3

).

3. Remove both top and bottom Channel Covers as well as both cable clamps.

4. Take the cables from the monitor side (upper half) of the Mounting Channel and direct them into the space occu-

pied by the Upper Cable clamp.

5. Install the Upper Cable clamp back into its original space and clamp over the cables going through it. Ensure the fit

is tight and the cables cannot move around inside.

6. Do the same with cables coming from the keyboard tray side (lower half) of the Mounting Channel; make sure the

cables are clamped tightly in the Cable clamps.

7. Leave 4-6 feet (121.92-182.88 cm) of cables inside the left side cavity of the Condor for the cables to move around.

Insert the rest of the cables through the top/bottom cap. Whether the cables exit from the top or bottom side of
the Condor should depend on the positioning of the CPU in relation to the Condor.

8. Connect the cables to the CPU.

9. Replace the Channel Covers by sliding them into the Mounting Channel, covering up the cables. Trim off any excess

Channel Covers.

10. Replace the left Condor cover.

SECTION 6:

Cable Management

Cable Opening

Upper Cable clamp

Lower Cable clamp

Cable

Figure 6

www.amico.com

15

Advertising