6.4.1 Summary of NFPA 99 Specification (Air Compressors System)

PART 1 – GENERAL (Medical Air)

RELATED DOCUMENTS:

Drawings and general provisions of the Contract, including general and supplementary

conditions and Division I specification section, apply to this section.

SUMMARY EXTENT OF WORK

A.

This section pertains to all labor, equipment and services necessary for and complementary to the

installation of piped medical gas and vacuum systems (PMGVS) including: oxygen, medical air, medical

vacuum, waste anesthesia gas disposal (WAGD), nitrogen, instrument air, nitrous oxide, helium, carbon

dioxide, argon, dental air, dental vacuum, laboratory air and mixed gas systems as shown on the drawings

and/specified herein.

1.

Oxygen systems shall be complete to the source valve, ready for connection to the bulk gas supply

system.

2.

Medical Vacuum, WAGD and Medical Air systems shall be complete, started, tested and ready for

use.

3.

Nitrous Oxide, Nitrogen, Carbon Dioxide, Helium, Argon and Mixed Gas. Systems shall be complete,

tested and ready for use.

PERFORMANCE REQUIREMENTS

A.

All materials used shall be new and of the best grade and quality available and workmanship shall be first

class in every respect. Contractor shall be accountable for compliance with all Local, State or

Federal codes.

B.

Provide all elements and accessories required for complete systems per latest edition of NFPA 99.

C.

Contractor shall make all necessary connections to owner furnished equipment.

D.

Install all piping as shown on Drawings, described herein and as described in Section 15050, Basic Materials

and Methods, using methods of fabrication, grading, testing, repairing, cleaning and other procedures.

E.

Electrical power wiring for vacuum pump(s), medical air compressor(s), WAGD Producer(s), ceiling columns,

alarms, and modular accessories associated with the system(s) shall be part of the electrical contract. Any

equipment supplied by a contractor requiring additional electrical services shall be the responsibility of the

contractor to supply these services.

F.

Perform Installer pressure testing, cross connection testing and final testing per NFPA 99 most recent edition

and using procedures as specified.

Specifiers; if contractor will retain Verifier, use this paragraph:

G.

Retain a qualified third party verifier acceptable to the engineer and owner to perform and attest to final

verification of the systems. Make corrections as needed, including additional testing in order to illustrate full