3.

Warranties shall include on site repairs including travel, labor and parts.

4.

Shipping and installation costs after the first 12 months will be borne by the customer.

D. Verification:

1.

Medical Gas Contractor shall deliver to the owner a complete system certification.

PART 2 - PRODUCTS

QUALIFICATION OF MANUFACTURER(S)

A.

The Medical Gas Equipment Manufacturer (MGEM) shall supply all of the medical-gas system(s) and shall be

the manufacturer of the outlets, valves and gauges, valve boxes, alarm panels, manifolds, medical air,

instrument air, vacuum and WAGD sources.

B.

The MGEM shall have a product specialist available to periodically check with the contractor during

installation of the pipeline systems equipment. MGEM shall provide service support to the hospital after

turnover. Demonstrate factory trained service technician is available within 250 miles of facility.

C.

Approved MGEM: Piping Systems Components and Medical Gas Alarms;

1.

Amico Corporation.

2.

Alternate by _____________ with pre-approval.

D.

MGEM shall have a minimum of 5 years of experience manufacturing medical air and vacuum systems.

E.

Written pre-approval is required for all equipment from other manufacturers.

MEDICAL AIR COMPRESSOR SYSTEMS
Specifier: Determine the size of medical air plant required and place on the medical gas schedule.

1. Provide a complete medical air source, complying with all relevant requirements of NFPA 99 latest

edition and supplying medical air continuously for the life of the equipment. The unit shall be

manufactured by Amico or pre-approved equal.

2.

All components are at least duplexed and valved to allow servicing to any components devoid of

interruption to the air supply of the facility.

3.

Furnish a complete plant consisting of compressors, receiver, air treatment system and controls

capable of providing scheduled capacity with one compressor out of service.

4.

System is modular or field separable, allowing for ease of shipment and handling on site. System is

completely factory assembled, requiring only interconnection between modules on site. Systems

requiring site assembly other than interconnection are not acceptable (remounting of components

removed for shipping is permitted).

5.

The compressor modules and motors shall be fully isolated from the main compressor base by

means of a four point, heavy-duty seismic restrained approved isolation system for a minimum
of 95% isolation efficiency. Engineering data shall be provided to support isolation efficiency and
equal weight distribution between supports. Pumps not having this feature shall have an inertia
base sized for that system installed at this contractor’s expense.