BoonDocker POLARIS: 2011-14 PRO RMK 800 Intercooled User Manual

Page 6

Advertising
background image

Revised 10/22/2014

Page 6 of ?

www.boondockers.com……………….....

……….………………....877-522-7805

25. Install foot rest kick plate. (

Note: install kick

plate “only install the 2 lower rivets on top running
board at this time”) the last rivet will be installed
later to adjust clearance

26. Remove the stock pipe from Y-pipe, remove
the exhaust donut and run a bead of silicone
around inside and reinstall on Y-pipe,

Note:

make sure to align notches on Y-pipe to donut

27.Run a bead of silicone on the inside of the
flange on the exhaust pipe.

28. Install springs from pipe to Y-pipe 2-springs
on side spring tabs and 3-springs on top spring
tab.

29.Run a bead of silicone on inside of the small
exhaust donut and install on pipe

30. Run a bead of silicone on inside of the bell
of turbo inlet pipe. Bolt inlet to turbo using 4
bolts and 4 hole gasket . If installing stainless
Tial see next step.

Advertising