SSG MULL CAP INSTALLATION

1) MULL CAPS ARE TO

BE INSTALLED AT

HEAD AND SILL OF

EACH UNIT.

2) CAP SHALL BE

BED IN SEALANT TO

MULLION

3) ATTACH W/FS-23

4) SEAL FILLER SIDE

JUST PRIOR TO INSTALLATION

OF UNIT INTO OPENING

HP175-FP59 MULL CAP

MODIFY AS SHOWN

AT JAMB

DRILL #17 (.173)

CLEAR HOLE

SEAL FILLER

SIDE OF MULL

DURING UNIT

INSTALLATION

FS-23

(#8 X 1/2" PPH)

CAPSEAL