SSG - INSTALLING-ANCHORING UNITS

ANCHOR SIZE DETERMINED

BY STRUCTURAL REQUIREMENTS

HP-10435

HP-10343

NOTE:

1) INSTALL FIRST UNIT, PLUMB,

SQUARE AND ANCHOR.

2) ROTATE NEXT UNIT INTO PLACE

AND ANCHOR.

3) REPEAT ACROSS OPENING.

4) ANCHOR BOLTS REQUIRED AT

6" OF EACH SIDE OF MULLION.

5) INSTALL HP-10343 SNAP FILLERS

AFTER UNIT HAS BEEN FULLY

INSTALLED AND ANCHORED.

ANCHOR WITH PIPESLEEVE

REQUIRED FOR LIVELOAD ONLY.

PLACE FRONT HOOK OF

HP-10390 FILLER OVER

LEG OF HP-10469 MULL.

ONCE UNIT IS POSITIONED AS

SHOWN IN DETAIL AT LEFT.

ROTATE AS SHOWN ABOVE

UNTIL FILLER SNAPS INTO

MULLION. THEN SHIM AND

ANCHOR AS SHOWN BELOW.

NHP-10446