5 pit installation, Installation diagram – Rice Lake AutoLift HE Low-Profile Lift User Manual

Page 9

Advertising
background image

Installation

5

Load cell cables from the scale platform to the junction box should be protected with conduit.

When the interface cable is protected and in its final position, complete the connections at the indicator. See your
indicator instruction manual to determine its input wiring leads.

2.5

Pit Installation

Each site has different concrete/foundation support requirements. Install the pit in a suitable poured-concrete foun-
dation according to standard construction practices. Allow concrete seven days to cure; wet concrete periodically
during this time
See Figure 2-1 on page 6 for an example of a typical pit installation.

The dimensions shown may change according to your particular site.

Installation Diagram

• The following reference numbers apply to Figure 2-1 on page 6.
• Length of conduit pipe is determined on site.
• Use concrete of minimum yield strength 5000 psi or 6-bag mix.
• Slope pipe for water drainage.
• Tie pit in with existing floor with re-bar, if required.
• Ensure underside is supported with concrete or grout (plate is an integral part of the frame).
• Keep pocket free of concrete.
• Coping must sit level in floor to allow proper scale operation.

Size

A

B

C

D

E

F

4X4

63.06

49.06

49.00

63.00

41936

15.00

5X5

75.06

61.06

61.00

75.00

41397

16.75

4X6

63.06

49.06

73.00

87.00

15.00

Table 2-2: Reference to

Figure 2-4 on page 5

.

Note

Note

Advertising