1 load cell wiring to junction box, Figure 11-4 28, Figure 11-3. w – Rice Lake Bariatric Wheelchair Scale (SB-1150) User Manual

Page 32

Advertising
background image

28

SB-1150 Installation & Operation Manual

Figure 11-3. Foot Pad - Side View

Route the load cell cables near each corner so that the

cable is free from possible contact with each foot.

Hold the cable in position with the supplied

adhesive-backed cable ties.
Do not cut load cell cables. Coil extra cable before it

enters the junction box, tie with cable ties, and insert

the coils into the channel near the junction box.
After coiling excess cable, pass each individual end of

load cell cable through its grommet in the junction

box cover (or through cable fittings in the NEMA 4X

junction box).
Corner correction trimming and calibration is

necessary after load cell replacement. Follow

instructions in Section 4.2 on page 6.

11.3.1

Load Cell Wiring to Junction Box

The four load cells are each wired to their respective

terminals in the junction box according to the corner

numbering system shown in Figure 11-4, and the

coloring code in Table 11-1.
Pull excess cable out of the junction box enclosure

and tighten the cable grips with a wrench. To be

watertight, the cable grips must be tightened to the

point where the rubber sleeving begins to protrude out

of the hub. Finally, pull on each of the four cables to

make sure that they do not slip.

Figure 11-4. Corner Numbering - Top View

,o,NPEFMT

Cable Color Code

J-Box Terminal

Red

+Excitation

Black

-Excitation

Green

+Signal

White

-Signal

Table 11-1. Load Cell Wiring

1

4

2

3

Advertising