Rice Lake Bariatric Wheelchair Scale (SB-1150) User Manual

Page 9

Advertising
background image

SB-1150 Installation & Operation Manual - Scale Installation

5

7. The cable must be routed to the indicator in a manner that will protect the cable from damage. This

method of cable protection in non-washdown applications are shown in Figure 3-3. When planning cable

routing, leave a loose coil of excess cable under the scale to facilitate future lifting of the scale for

servicing or cleaning.

Figure 3-3. Load Cell Protection

8. When the interface cable is protected and in its final position, complete connections to the indicator. See

the indicator installation manual for wiring information.

9. If necessary, trim corners as described in Section 4.2 on page 6.
10. Check all strain relief fittings for tightness.
11. Put the cover back onto the junction box assembly and slide the junction box back into the floor scale

cutout.

12. Secure the Summit SB-1150 side plate.

SCALE FLOOR

LOAD CELL CABLE

Advertising