5 check after installation and start-up, 6 spare parts and accessories, Mounting kits pr 6002 installation manual – Rice Lake PR6202 Hygienic Weigh Module Kits User Manual

Page 24

Advertising
background image

Mounting Kits PR 6002

Installation Manual

EN-22

Sartorius

5 Check after Installation and Start-Up

After the installation of all mounting kits and load cells, the correct mounting must be checked. In

particular, force shunts must be avoided.
After mounting also, check
• whether the load cell is inserted without tilt in the mounting kit.
• whether the upper and lower mounting plate is positioned horizontally.
• whether there are vertical space for movement and the required space for thermal expansion.
• whether there are clearance of the constrainer.
The space for movement required for displacement of the object to be weighed due to thermal

expansion, vibration, etc. can be used only if load cell is installed exactly.
To prevent vertical force shunts, all mechanical connections (pipes, cables and bellows) of the object to

be weighed to its surrounding construction must be as flexible as possible. The overall load must be

supported by the load cells.

6 Spare Parts and Accessories

Pos. Description

Max. capacity

Order number

1 Lift-off protection (stainless steel)

5312 502 18011

2 Rubber ring for mounting

1…10 t

5312 693 98117

3 Rubber ring for mounting

25…50 t

5312 693 98118

Advertising