Rice Lake RL1200 Portable Beam Scale User Manual

Page 12

Advertising
background image

8

RL1200

3. To put the connecting steelyard rod into position inside the pillar, raise the long lever under the scale base and

hook the lower end of the rod with loop in the nose iron assembly.

Hook loop onto the
nose iron assembly
under scale base

Figure 2-9. Attach Hook to Nose Iron Assembly

4. Temporarily hang the steelyard rod on the cutout in the pillar as shown.

Figure 2-10. Steelyard Hook on Pillar Cutout

Important

If assembling the Mechanical to Electronic version of the RL1200, please proceed to
Chapter 5 on page 14 for further assembly instructions.

5. Place the weight rack on top of the pillar with the hook facing as shown.

Hook and
steelyard
hook should
both face as
shown.

Figure 2-11. Place Weight Rack on Pillar

Advertising
This manual is related to the following products: