Rice Lake RL1200 Portable Beam Scale User Manual

Page 25

Advertising
background image

Indicator and Load Cell Installation

21

4. Place the indicator base plate on pillar aligning the pillar rods through the base plate holes and handles facing

the back of the scale.

Pillar rods

Attach the steelyard hook
through eye-bolt

Figure 4-3. Mount Base Plate to Pillar and Attach Steelyard Hook

5. Hook the steelyard hook through the eye-bolt as shown in Figure 4-3.
6. Push the load cell cable inside pillar leaving enough slack inside pillar and draw the cable end up through hole

in the base plate.

Figure 4-4. Run Load Cell Cable Through Base Plate and Tighten Base Plate to Pillar

7. Tighten the indicator base plate to the pillar by using lock washers and acorn nuts as shown in Figure 4-4.
8. Run load cell cable through the tilt stand on the indicator.

Figure 4-5. Run Load Cell Cable Through Bottom of Indicator Tilt Stand

Advertising
This manual is related to the following products: