2 indicator and load cell installation – Rice Lake RL1200 Portable Beam Scale User Manual

Page 24

Advertising
background image

20

RL1200

4.2

Indicator and Load Cell Installation

Use the following steps to attach the indicator and load cell to the RL1200.

1. Take the indicator base plate and lay it on its side.
2. Note the orientation of the load cell. Put the 3.5" bolt through the long bolt washer and through the top of the

indicator base plate. Thread on the locknut to the bottom of the bolt.

Figure 4-1. Set Indicator Base Plate on Side and Attach Load Cell

3. Screw the eye bolt and locknut into the bottom of the load cell until flush. Tighten the locknut.

Figure 4-2. Screw Eye-Bolt Into Load Cell

Locknuts

2

Long bolt

1

Long bolt washer

1

Item Description

Quantity

Table 4-1: Conversion Kits Parts List

Advertising
This manual is related to the following products: