Start--up checklist – Carrier 48ES---A User Manual

Page 37

Advertising
background image

37

START--UP CHECKLIST

(Remove and Store in Job Files)

I. PRELIMINARY INFORMATION
MODEL NO.:
SERIAL NO.:
DATE:
TECHNICIAN:

II. PRESTART--UP (Insert check mark in box as each item is completed)
( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
( ) CHECK GAS PIPING FOR LEAKS (WHERE APPLICABLE)
( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE
( ) VERIFY THAT UNIT INSTALLATION IS LEVEL
( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

III. START--UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS
INDOOR (EVAPORATOR) FAN AMPS
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE

DB

RETURN--AIR TEMPERATURE

DB

WB

COOLING SUPPLY AIR

DB

WB

GAS HEAT SUPPLY AIR
PRESSURES
GAS INLET PRESSURE

IN. W.C.

GAS MANIFOLD PRESSURE

IN. W.C.

REFRIGERANT SUCTION

PSIG, SUCTION LINE TEMP*

REFRIGERANT DISCHARGE

PSIG, LIQUID TEMP{

( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GAS HEAT TEMPERATURE RISE
TEMPERATURE RISE (See Literature) RANGE
MEASURED TEMPERATURE RISE

* Measured at suction inlet to compressor
{

Measured at liquid line leaving condenser.

48E

S

--

A

Advertising