7 assembly and installation of mid pto, Assembly and installation of mid pto – Cub Cadet 7532 User Manual

Page 115

Advertising
background image

Transmission

5

74

5.7

Assembly and Installation of
MID PTO

1

Assembly of MID PTO

1. Clean each part sufficiently and assemble.

2. Make sure that snap rings and spring pins are

securely attached.

3. Apply oil to the O-ring and needle bearing for

assembly.

4. Apply lithium grease to the oil seal for assembly.

5. Assemble as shown in the drawing for the spur

gears with specified mounting direction (edgy or
chamfered side).

41T

46T

24T

Grease

Oil

Oil

GZ3W24-040

Advertising
This manual is related to the following products: