Hottop coffee roaster parts diagram – Chang Yue Industrial KN-8828P User Manual

Page 6

Advertising
background image

6

1

2

ON

OFF

Base

Bean Agitation Arm

Chaff Tray

Cooling Tray

Roasting Chamber

Viewing Window

Gold Knob

Front Cover

Top Filter

Bean Insertion-Chute Cover

Rear Filter

Main Cooling Fan

Control Panel

Hottop Coffee Roaster

Parts Diagram

How to Install the
Heat-Guard Grills

1) Attach front support on mounting

hook, holding the guard at an angle as

shown.

2) Lower rear of guard into position

being sure that both front and rear

guard-supports are hooked onto Coffee

Roaster.

To Remove: Wait until machine has

cooled to room temperature. While

holding front of guard in place (1),

raise rear of guard until support clears

the rear mounting hook (2).

WARNING: Always operate the

Hottop Coffee Roaster with the

heat-guard grills in place. Do not

lift or carry the Coffee Roaster by

the heat guards.

(panel design

varies by model)

Heat-Guard Grill

Advertising
This manual is related to the following products: