Hangar 9 Alpha 40 ARF Trainer User Manual

Page 17

Advertising
background image

17

Hangar 9 Alpha 40 ARF Assembly Manual

Step 16

The second tray goes in the same as the first, but is

positioned to the front of the fuselage.

Step 17

Once both trays are in the fuselage, use a small amount

of 30-minute epoxy to glue the trays to the sides of the

fuselage. Make sure they are secure so the weight of the

battery does not cause them to come loose.

Step 18

The next step is to remove the backing from the hook and loop

material from the speed control and secure it to the battery

trays. This is tricky and will require patience to accomplish.

Step 19

Use the hook and loop straps to secure the motor battery

in the fuselage. If the battery slides forward or aft in the

fuselage, use a small piece of hook and loop tape between

the tray and battery to prevent it from doing so.

Step 20

Use a hobby knife with a #11 blade to expose the two holes

for the fuselage hatch mounting screws.

Advertising