Overview and site preparation, Overview, Prepare site eor instaeeation – Kenmore ULTRAFILTER 650 625.38556 User Manual

Page 7

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Overview and Site Preparation

OVERVIEW

There are seven easy steps to installing your Drinking
Water system. They are as follows:

STEP 1 - Install Cold Water Supply fitting

STEP 2 - Install Drain Adapter

STEP 3 - Install Reverse Osmosis Assembly

STEP 4 - Install Storage Tank

STEP 5 - Install Reverse Osmosis Faucet

STEP 6 - Connect Tubing

STEP 7 - Sanitize, Pressure Test, Purge System

These steps are explained in detail over the next few
pages.
It is recommended to read through the entire manual
before beginning your installation. Follow all steps exact­
ly. Reading this manual will also help you receive and
use all the benefits your Reverse Osmosis System can
give you.

PREPARE SITE EOR INSTAEEATION
1. Before starting, close the hot and cold water shutoff

valves (See Figure 5).

2. Temporarily place tank and filter assembly into cabi­

net. Double check position of items and space required
for proper installation.

3. Remove tank and filter from cabinet and set aside.

NOTE: You must check and comply with all local
plumbing codes.

Figure 4

Questions? Call The Kenmore Water Line 1-800-426-9345 or visit KenmoreWater.com

Advertising