Power management, The power management process, Figure 4.2 – Avaya P460 User Manual

Page 37: Power management priority

Advertising
background image

Chapter 4

Turning on the Avaya P460

Avaya P460

Installation and Maintenance Guide

23

Power Management

The Supervisor module checks the PSU status every three seconds by comparing the
current state to the previously saved PSU state.

Figure 4.2

Power Management Priority

The Power Management Process

L The power management process is activated in the SPV only if there is a change

in power requirements or supply caused by one of the following events:

Power-up sequence

PSU removal if there are two PSUs

PSU insertion if there is only one PSU

I/O module insertion

I/O module removal

Administratively enabling/disabling a slot

L Removing both supervisors turns off the entire system.
L In case of power failure in a module, the Supervisor module receives an

indication from the failed module. The Supervisor module will turn off the I/O
module and issues a warning.

1

2

3

4

5

6

Advertising