2 unpacking and assembly – KERN & SOHN MLB 50-3C User Manual

Page 16

Advertising
background image

16

MLB_C-BA-e-1431

6.2 Unpacking and assembly

Take the moisture meter carefully out of its packaging, remove the plastic jacket and
install it at the designated work space.
The moisture meter is supplied part-assembled. Control whether the delivery is
complete immediately after unpacking the individual parts and assemble the separate
component parts according to the enclosed diagram.

Put on the dish retainer carefully, ensuring correct positioning:

Level instrument with foot screws until the air bubble of the water
balance is in the prescribed circle.

Check levelling regularly.

Sample dish

Dish retainer

Removal aid

Windshield

Windshield base plate

Advertising