Unpacking/installation – KERN & SOHN GAB 30K5DNM User Manual

Page 10

Advertising
background image

10

GAB-N-BA-e-1315

5.2 Unpacking/installation
Carefully remove the balance from the packaging, remove plastic cover and setup
balance at the intended workstation.

Ensure that transport guard has been removed
(only existing in 6 kg models)

To loosen

the transport guard screw out transport screw [1] anticlockwise.


For transportation

screw down the transport screw till to the stop in clockwise

direction.

1

Advertising
This manual is related to the following products: