Configuring modular rack and aps6 modules – PRG VL6C+ User Manual

Page 32

Advertising
background image

24

VL6C+ ™ SPOT LUMINAIRE USER MANUAL

Configuring Modular Rack and APS6 Modules

Set Modular Rack SixPack chassis delta/wye switch(es) to correct setting:

Determine requirements for either delta or wye load.

+

While operation as a delta load is typical in the U.S., most European countries require the system to be configured
as a wye load. For example, if the house service is a wye-connected source and the phase-to-neutral voltage is
220, the system must be configured as a wye load.

+

Also note that if line voltage is 120 phase-to-neutral, the system must be configured as a delta load. If line voltage
is 220 phase-to-neutral, the system must be configured as a wye load.

At rear of SixPack chassis, set switch to required setting (Figure 2-8).

Figure 2-8: Series 300 Modular Rack SixPack Chassis

Table 2-2: Requirements For Delta and Wye Loads

Type

VAC

Phase to

Neutral

VAC

Phase to

Phase

Delta/Wye

Jumper

Position

Voltage

to

Modules

Wye

100-130

175 - 225

Delta

175 - 225

Wye

180 - 240

310 - 415

Wye

180 - 240

Delta

-

180 - 240

Delta

180 - 240

Single Phase

180 - 240

-

Wye

180 - 240

Delta/Wye Switch

SIXPACK CHASSIS REAR VIEW

Advertising