V. adjustments and minor maintenance, Adjustments and minor maintenance, Initial setup hotcup operators’ guide – CMS Products 674 User Manual

Page 36

Advertising
background image

Initial Setup

HotCup Operators’ Guide

6740001

30

November, 2007

V.

ADJUSTMENTS AND MINOR MAINTENANCE

1.

Empty the Bill Stacker

2.

Adjust the Water Valves

Water valves do not usually require adjustment, but in some cases adequate water volume cannot
be achieved by the throw time setting alone (See “Programming The HotCup” on page 34). If
absolutely necessary, adjust the valves in conjunction with setting the factory default timers during
the Product Configuration programming mode.

a. Using a slotted screwdriver, turn the adjustment screw clockwise to decrease the water flow

rate.

b. Turn the adjustment screw counterclockwise to increase the water flow rate.

WATER VALVE
ADJUSTMENT
SCREW

WATER
VALVE

+

-

1

2

3

4

5

6

WATER

6

WATER
TANK

Advertising
This manual is related to the following products:

676