VACUUBRAND PC 600 LAN User Manual

Page 40

Advertising
background image

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. Manual-no.: 999084 / 05/10/2009

page 40 of 46

If the pump does not achieve the ultimate pressure:

☞ In case the diaphragms and valves have been replaced, a run-in period of several

hours is required before the pump achieves its ultimate vacuum.

If all pump heads achieve a vacuum below 120 mbar but pump does not achieve the
ultimate total pressure:
Check hose connectors between pump heads and manifolds for leaks. If necessary
recheck pump chamber.

Assembling the pump at the pump support and on the base plate:

➨ Tighten union nuts first by hand and then tighten one full

turn using open ended wrench (w/f 17).

PC 600 LAN
➨ Assemble pump at pump support. Support pump appropriately.

➨ Screw in at each case two socket head screws at the rear and the front of the pump with hex key size

5. Pay attention to washers.

➨ Position pump with pump support on the base plate and tighten the four hexagon nuts on the feet of the

pump support with an open-ended wrench w/f 10.

PC 500/600 LAN
➨ Screw controller to holding plate.

☞ Using hex key size 7 fix socket head screw at rear of controller.

➨ Reassemble connections at controller.

➨ Reconnect hose to the inlet of the condenser and tighten

union nut.

➨ Use open-ended wrench to reconnect hose to elbow fitting.

Advertising
This manual is related to the following products: