2 dip, Switches, 2 hardware – ADLINK aTCA-N700 User Manual

Page 15: Installation, 1 front blade

Advertising
background image

aTCA-RN710 User's Guide

15

Step 5: When the chassis is powered up and in operation (Hot Swap situation), during board
installation the board starts booting up as soon as the handles are fully closed in Step 4.

Figure 4-3 Injector (Bottom side)

Figure 4-4 Plugging the Board

Note:

After plugging in the board, make sure that the injector handle is locked into the hole on the faceplate. This will activate

the hot swap switch and the booting will start.

To pull out the main board, follow the steps described as follows:


Step 1: The bottom side injector handle should be slightly pulled out to the front from the hole
without pulling out the board.

Step 2: Once the injector handle is out from the hole, the Hot Swap switch becomes OPEN

Step 3: The Hot Swap LED (or Blue LED) should then start blinking and it will stay ON after several
seconds, which indicates the READY status.

Step 4: At the READY status, completely open the top and the bottom handles and pull out the
board from the chassis.

Advertising