Warning – Dunkirk EW Empire II Series II User Manual

Page 18

Advertising
background image

18

ELECTRICAL CONNECTIONS

Thermostat

Install 24 Volt thermostat (not provided) in proper location.

Location of thermostat has effect on boiler system operation.

Follow instructions included with thermostat.

Grounding

Permanently ground boiler according to local codes and

latest revision of the National Electrical Code. Run 14

gauge or heavier copper wire from boiler to grounded

connection in service panel or properly driven and

electrically grounded ground rod.

Electric Power Supply

Installation must comply with the latest revision of the

National Electrical Code, any other national, state, or local

codes or regulations.

Connect 115 volt electrical supply to L1 and L2 terminals

on limit and two thermostat wires to T and T terminals on

same limit. See wiring diagram page 28.

Run separate circuit from separate over current protection

device in your electrical service entrance panel. Minimum

15 ampere circuit. Locate shutoff switch at boiler. Turn off

during any maintenance. Solder and tape or securely fasten
connections with wire nuts.

Oil Burner Wiring

For boilers packaged with oil burners, burners are wired

at the factory. For boilers shipped without a burner, wiring

connections are shown in the electrical wiring diagrams of

this manual.

WARNING

Electrical shock hazard. Turn OFF electrical power supply

at service panel before making electrical connections.

Failure to do so could result in death or serious injury.

!

Advertising