Put the gauge into operation. If you are using a Nor-Cal con-
troller, define the measurement range.

A warm-up time of at least 90 minutes should be allowed; for
precise pressure measurements a warm-up time of at least
3 hours is required.

4.1

Status Indication

SP1

SP2

STATUS

SP

ZERO

LED

LED status

Meaning

<STATUS>

off

no supply voltage

lit solid green

measurement mode

blinking green

short blinks
long blinks


warning
warming up

lit solid red

error

<SP1>

lit solid green

p

≤ setpoint 1

blinking green

waiting for setpoint 1 input

off

p > setpoint 1

<SP2>

lit solid green

p

≤ setpoint 2

blinking green

waiting for setpoint 2 input

off

p > setpoint 2