3.2.2

Warranty and liability

All claims to warranty and liability will be rendered invalid if

}

The product was used contrary to the purpose for which it is intended

}

Damage can be attributed to not having followed the guidelines in the manual

}

Operating personnel are not suitably qualified

}

Any type of modification has been made (e.g. exchanging components on the PCB
boards, soldering work etc.).

3.2.3

Disposal

}

When decommissioning, please comply with local regulations regarding the disposal of
electronic devices (e.g. Electrical and Electronic Equipment Act).

3.3

Unit­specific safety regulations

Before you install or commission the system, you should refer to any guidelines laid down
by the control manufacturer or operator.

3.3.1

Installation site

}

Do not position PMI close to highly flammable materials.

}

When installing the unit within a control cabinet, you must ensure the ventilation slots
are not obstructed, otherwise the unit could be damaged through overheating.

}

Protect the unit from direct sunlight and dust.

3.3.2

Measures to protect against interference

}

If necessary, use bulkhead separators to protect the unit from sources of interference.

}

Inductive loads within the environment (e.g. contactor, relay and solenoid valve coils)
should be wired using suppression elements (e.g. RC elements). This is particularly im­
portant if these inductive loads are fed from the same supply.

}

The power cables and the data cables should be physically separated from each other
in their own conduits (recommended minimum distance: 10 cm/3.94"). This will avoid in­
ductive and capacitive interference.

}

The prescribed earth point 

 for the functional earth guarantees compliance with

noise immunity requirements.
Connect the functional earth to the central earth point in star form. A cable cross sec­
tion of at least 1.5 mm² should be used for the connection. Connections should be kept
as short as possible.

3.3.3

Supply voltage

}

The supply voltage must be +24 V DC