Step 2 attach the velcro and leaders to the rails – Baby Lock Crown Jewel (Previous Model) (BLCJ18) Instruction and Reference Guide Addendum User Manual

Page 3

Advertising
background image

D. The Quilt Top Rail
1. The quilt top rail is below the backing rail on the
front of the quilt frame
a) The quilt top will be rolled onto this rail
2. The quilt top rail rotates away from the center of
the frame
a) If the rail is turning in the wrong direction, lift
it off the frame, turn it around and place it
back into the frame. (You are switching which
end is on the right and which end is on the
left.)

E. The Batting Rail
1. The batting rail is below and slightly behind the
other two rails on the front of the frame
a) The batting rail does not have ratchets and
turns freely in both directions

A. Mark the Rail
It is helpful to mark the center of each rail
1. Painters tape is an easy way to mark the rails
a) Place a line at the center of the rail
b) If it makes it easier for you to remember
which way the rails fit into the frame, also
label left and right on the tape

B. Cloth Leaders
1. Cloth leaders have markings that make it
easy to get the quilt back and quilt top
centered and straight on the frame
2. There are several different leader packages
available at your local authorized Baby Lock
retail store
a) Baby Lock Quilt Leaders
(1) 9.5 foot length - part #BLQL
b) Start-Right Cloth Leaders
(1) 10 foot length - part #GFCL
(2) 12 foot length - part# GFCL-12

Step 2
Attach the Velcro and Leaders
to the Rails

2

Advertising