Set up inlet dosing tube, Set up outlet dosing tube, 0 set up outlet dosing tube – Bluelab pH Controller Connect Manual User Manual

Page 7: 0 set up inlet dosing tube, English

Advertising
background image

English

7

9.0 Set up outlet dosing tube

Insert the remaining dosing tube with

connector into the RIGHT peristaltic pump

tube. This is the ‘outlet dosing tube’.

Cut the outlet dosing tube so that the tube

sits above the maximum solution level of the

reservoir/tank. The pH stock solution must

drip into the nutrient reservoir/tank.
Note: If the outlet dosing tube is immersed

in reservoir/tank solution, it could create

a syphon. This would cause the pH stock

solution to overfl ow.

8.0 Set up inlet dosing tube

To straighten tube:

Bend tube in the opposite direction and

straighten by running through closed fi ngers.

Insert one end of the dosing tube with

connector into the LEFT peristaltic pump tube.

This is the ‘inlet dosing tube’.

Ensure the inlet dosing tube will reach the

bottom of the pH stock solution container.
There also needs to be enough tube left for the

outlet dosing tube to go into the reservoir/tank.
Cut the inlet dosing tube to the desired length.
Use inlet tube cap supplied to place on

Bluelab Up or Down 500ml or 1 Liter bottles.

This will hold the tube in position. Insert the

inlet dosing tube through the hole in the cap

and pierce the induction seal on the bottle.

1

2

1

2

3

Inlet ‘’

arrow on

pump cover

Connector

Connector

Left pump

tube

Inlet dosing

tube

Inlet dosing

tube

Outlet dosing

tube

Nutrient solution

reservoir / tank

Outlet ‘’ arrow

on pump cover

Dosing tube reaches

bottom of container

Inlet tube cap

pH stock

solution

Right pump tube

pH stock

solution

Advertising
This manual is related to the following products: