Assembling the gel drying stack – Hoefer SE1200 User Manual

Page 16

Advertising
background image

Assembling the Gel Drying Stack

Gel frames that are delivered in the same pack-
age as the Easy Breeze are preassembled. When
you order additional SE1210 Series gel frames,
you must install the eight knobs that lock the
inner frame in place before they can be used.

Working with gel frames that are
not preassembled

Screw the eight black knobs into the outer
gel frame until they fit just short of snug. (See
Fig 2.) Continue with step 1 of the assembly
instructions.

Working with preassembled gel frames

Turn each black knob a one-quarter turn to
release the inner frame. (See Fig 3.) Gently pop
the inner frame out of the outer frame and
continue with step 1 of the assembly instructions.

1

Place the inner frame on the loading platform with
the side labeled UP facing up.

2

Immerse a sheet of porous cellophane in distilled
water and soak for several minutes. Place the fully
hydrated sheet over the inner frame on the loading
platform. Pour 5 – 10 ml of distilled water onto
the sheet.

3

Place the gel(s) on the cellophane. Remove all
bubbles by carefully pushing them toward the edge
of the gel with your gloved finger.

p7

Advertising