Clearances, Installation – Montigo H38DF-CLCR User Manual

Page 9

Advertising
background image

Page 9

XG0213 - 150204.2

H*38DF-CLCR Corner Gas Fireplace

Installation

MODEL

Top - Rear V

ent

Top - Top V

ent

Header

Side (Solid side)

Floor

Back

Venting - T

op

Venting - Sides, bottom

M

antle

H*38C*

13" 17 1/2" 4"

5"

0" 1" 2"

1"

**

Clearances
When installing a shelf over the top of the fireplaces, the following

guidelines must be adhered to:

For Rear Vent applications, the minimum clearance is 1" from the rear of

the fireplace to a wall, or any combustible materials, and 13" clearance

from the top of the fireplace to the underside of any combustible shelf

materials.

For Top Vent applications, the minimum clearance is 1" from the rear

of the fireplace to a wall, or any combustible materials, and 17 1/2" to

the underside of any combustible shelf materials.

1” clearance is maintained on sides and bottom of vent runs and 2”

above horizontal vent runs to any combustible material.

Installing The Standoffs
To avoid elevated mantel temperatures, all H*38C* gas fireplaces

are required to have the supplied standoffs installed. The fireplace is

supplied with two standoffs. Bend and install these standoffs on top

of the fireplace as shown in Figure 6, ensuring that the height of the

standoff maintains a 4" clearance from the top of the unit to the 1st

combustible stud.

Nailing Flange Extension

The 4" nailing flange extension is shipped attached to the top edge of

the fireplace, see Figure 1.

The nailing flange extension may be substituted with a piece of NON-

Combustible material of the same thermal characteristics, ie: cement

board or equivalent to fit the opening. This is recommended in applications

where the facing materials will not adhere to the metal nailing flange.

To remove the Nailing Flange Extension follow the directions below:

Figure 6� Installing the H*38C* standoffs.

Note: Clearance from top of fireplace to a ceiling within the fireplace

enclosure.
** Note: For mantel clearance, please refer to Section 6: Finishing

on page 21.

Figure 7c� Finished removing Nailing Flange extension.

Figure 7� Remove screws from top of the unit

Figure 7a� Remove shell and insulation from the top of unit. Remove screws

from outer edge.

Figure 7b� Remove the nailing flange extension from the unit. Reinstall shell

and insulation. Screw shell in place.

4”

Advertising
This manual is related to the following products: