Installation, Wiring installation – Montigo LDVPV47 User Manual

Page 9

Advertising
background image

Page 9

LDVPV47 Linear Power Vent System

XG0750 -112911

Installation

Section:

Figure 9. Conduit and Wiring Clearances.

Wiring Installation

Connect the wiring to the linear power vent as outlined in the previ-

ous section, and connect the wiring to the fireplace as outlined in the

schematic below. Ensure that the proper clearances are maintained

for the wiring and conduit.

„

When installing the wiring it must never run above the vent run

and it must be at least 1" clear of all venting.

1” Clearance

Mounting of Linear Power Vent for

specific Model Fireplaces

L52-DF, and L52-DF-ST Gas fireplace models.

Figure 8. L52-DF and L52-DF-ST vent clearances.

4’-0” MIN

Power Vent

1” MIN

4 -0 Clearance / void must be maintained at both ends of Power vent

unit, thru to exterior termination. This clearance does not include wire

conduit, pipe or other neccessary building component. It does however

include fibre insulation, and/or other heat retaining materials.

4’-0” MIN

Figure 7. LDVPV47 Linear Power Vent Framing in steel studs.

Figure 7a. LDVPV47 Linear Power Vent Framing to cement roof.

Important:

0” Clearance is required on mounting

surface if LDVPV is Listed under 28,000Btu.

If over 28,000Btu 1” must be maintained or

30% free air space surounding LDVPV.

Advertising