Installation – Montigo MD44 DV User Manual

Page 5

Advertising
background image

Page 5

Part No. XG0120

MD44-DV Direct Vent Vented Fireplace

Installing Terminations with Built-In Frames

Installing Terminations with MSR Frames

12

12

1. Frame the termination opening to 12" x 12".

2. Fasten the termination to the studs using a minimum of 4 screws.

11

11

1. Frame the termination opening to 11" x 11".

2. Fasten the termination to the studs using a minimum

of 4 screws.

Installation

PTKOG

1. Ensure that the two long mounting brackets are facing

the bottom of the termination. (See inset). This will
provide more heat protection at the top of the
termination, where temperatures are highest.

2. Attach to the faceplate of the termination using four

sheet metal screws.

Installing Heat Guards over Terminations

MSR

PTO-3F

PTO-3

Installing Terminations with MOSR Frames

12

12

12

MOSR

1. Frame the termination opening to 12" x 12".

2. Fasten the MSR frame to the interior side of the studs

using a minimum of 4 screws.

3. Insert the termination into the MSR frame as shown

here, and attach by screwing through the four pilot
holes in the termination.

PTO-3

Advertising