Niveo Professional NUPS22-6000U User Manual

Page 9

Advertising
background image

2-3. Rack/Tower Installation

2-3-1 Tower Installation
The UPS system is shipped with two sets of feet and 6 extensions (2 short extensions plus 4 long extensions)
that can be used to tower install the UPS module in 3U or UPS module with one battery bank in 6U.
Install UPS module in 3U
Assemble two feet and one short extension as
one tower stand shown in step 1. Align the
two stands approximately 35cm apart in step
2. Then, put UPS module in the stands as
shown in step 3.

Step 1 Step 2

Step 3

Install UPS module and one battery bank in
6U
Assemble two feet and two long extensions as
one tower stand shown in step 1. Align the
two stands approximately 35cm apart in step
2. Then, put UPS module and battery bank in
the stands as shown in step 3.

Step 1 Step 2

Step 3

Advertising
This manual is related to the following products: