581 green star rbs roller set (3) parts list, Adjustments and operation instructions, Rear attachment – Smithco Super Star Diesel 43-500 (sn 14560 – 14579) Parts & Service Manual User Manual

Page 152

Advertising
background image

C-45

Rear Attachment

42-581 GREEN STAR RBS ROLLER SET (3) PARTS LIST

REF#

PART#

DESCRIPTION

QUANTITY

1

42-574

Fork

3

2

18-295

Oilite Bushing

(part of 42-574)

6

3

HB-38-16-150

Bolt

3

/

8

- 16 x 1

1

/

2

12

HWL-38

Lock Washer

3

/

8

12

HW-38

Washer

3

/

8

12

HN-38-16

Nut

3

/

8

- 16

12

4

11-094

Pillow Block

6

5

42-584

Roller

3

6

42-539

Lynch Pin

5

/

16

(part of main frame)

3

7

42-586Q

Green Star RBS Main Frame

1

ADJUSTMENTS AND OPERATION INSTRUCTIONS

ADJUSTMENT

The springs are preset for maximum down pressure, and should not need to be adjusted. If you feel the need to
adjust the springs please call for further instructions. The unit comes pre-adjusted for most models. The four
adjustment holes on the hitch are for making sure all three rollers are touching the ground at the same pressure.
When installing roller system start with the lower mounting holes on hitch.

Tire pressure should be 4 psi in the front and 7 psi in the rear tire for best traction.

OPERATION

Make sure the rolling system has been installed and adjusted properly for your model of bunker rake. Always
transport in fully raised position. Always remove flag pole before rolling green. Do not stop on green while rolling.
Do not roll up steep slopes or loss of traction may result. Do not turn while rolling.

To begin rolling, lower unit all the way down as you come across collar and continue straight across green until
reaching other collar and raise as you come off of green. Overlap stripes the same as if you were mowing.

Advertising