Preparing your machine for operation, Overview, Assembly of minor components – Smithy GN1300 User Manual

Page 31: Drill chuck and arbor

Advertising
background image

Overview

The Quick-Start Manual you received before delivery of your Smithy machine

provides detailed instructions for mounting and locating your machine. Please

complete those instructions if you have not already done so. As you unpack, it

is a good idea to inventory the parts. (See chapter 3 for a complete list.) Before

operating your machine, you should assemble the remaining components of

your machine, clean the machine, and lubricate it. This section will guide you

through those steps.

Assembly of Minor Components

The installation of the drill chuck, arbor and arbor plug; mill spindle covers; and several

handles should be completed according to the procedures described below.

Drill Chuck and Arbor

Before proceeding both the arbor and the chuck should be thoroughly cleaned to ensure

a good fit. Once cleaned attach the chucks to the respective arbors. Follow the steps

below to achieve the best possible fit.

Step 1: Place the arbor in a freezer for about 1 hour to slightly shrink the metal.

Step 2: Remove the cold arbor from the freezer and place it into the drill chuck.

Step 3: Use a soft mallet or a block of wood to tap the end of the arbor.

Step 4: Allow the arbor to return to room temperature.

5

Preparing Your Machine

For Operation

Figure 5.1 Installing Arbor into Chuck

5-1

For Assistance: Call Toll Free 1-800-476-4849

Chuck

Jacobs Taper

MT3 Arbor

Advertising