On-off-on – SVS PLASMA TWO User Manual

Page 11

Advertising
background image

WHEN USING A TOUCH SCREEN CONTROLLER:
If an external controller is to be used (AMX, Crestron), please refer to the following wiring instructions
-see figure 8.

INSTRUCTIONS:

- Program a release of relays to stop on up and down positions.
- Program a time out after the normal run time, 1 or 2 seconds max.
1. Program an exclusive lockout on up and down so both positions cannot be activated at the same time.
2. Hold relays on to move the lift and release relays to stop the lift -always time out or release relay after
normal use. IMPORTANT: Never leave voltage on the up and down.

Always release voltage

immediately after the travel time has been achieved.

Wiring using Touch Screen Controller

(Figure 8).

IF USING ANY OTHER SYSTEMS, PLEASE CONTACT SVS FOR PROPER WIRING TO AVOID

UNSAFE OPERATIONS.

SVS PLASMA TWO LIFT INSTALLATION

Page 11 of 13

(SHOW)

93

+

-

(ON)

C

2

1

GRN

VIEW FROM BACK

BLK

ORN

BLK

WHT

MOTOR

POWER ON

80

ON-OFF-ON

77

RP2

WHT

24VAC

UP

DOWN

WHT

TOUCH SCREEN

RELAY TWO

TOUCH SCREEN

RELAY ONE

WHT

3

2

1

4

5

6

9

8

7

12

11

10

Advertising