INSTALLATION

EATON Powerware

®

BladeUPS

®

Bar Installation Guide

S 164201723 Rev P01

10

NOTE Verify that the bar is secure as shown in Figure 4. The sheetmetal at the base of the
bar should be below the tab on the wireway floor.

12. Secure the bar to the wireway with three M6

×12 hex bolts. Install

the bolts from the front of the rack. See Figure 5. Torque the bolts
to 5.1 ± 0.8 Nm (45 ± 7 lb in).

13. Reinstall the base bracket removed in Step 10. Install the bolts from

the front of the rack. See Figure 5. Torque the bolts to 5.1 ± 0.8 Nm
(45 ± 7 lb in).

NOTE Do not change the original orientation of the base bracket. Verify that the threaded
holes mount to the rack, not to the bar.

Rear of Rack

Front of Rack

Base Bracket

M6

×

12 Hex Bolts

(3 places)

Figure 5. Bar Base Installation