Chapter 2 installation, Inspecting the equipment, Setup – Eaton Electrical Powerware BladeUPS Bar User Manual

Page 9

Advertising
background image

EATON Powerware

®

BladeUPS

®

Bar Installation Guide

S 164201723 Rev P01

5

Chapter 2

Installation

This section explains:

S

Equipment inspection

S

BladeUPS Bar 60 setup and installation

Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file
a claim for shipping damage. If you discover damage after acceptance,
file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.

NOTE Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.

Setup

The BladeUPS Bar 60 comes with all hardware required for installation in
a standard EIA or JIS rack with square and round mounting holes.

Tools Required

To assemble the components, the following tools may be needed:

S

Torque wrench with the following attachments:

-

Hex socket size 10 mm for M6 hex bolt

-

Hex socket size 8 mm for M5 hex bolt

S

Torque driver with a Pozidriv

®

#2 for Pozidriv M4 screw

S

Large screwdriver or crowbar for lifting the bar in place

S

Pliers for installing cage nuts

Advertising