Eaton Electrical Powerware BladeUPS Bar User Manual

Page 16

Advertising
background image

INSTALLATION

EATON Powerware

®

BladeUPS

®

Bar Installation Guide

S 164201723 Rev P01

12

16. Install two M4

×8 pan-head screws into the tab on the wireway

floor, securing the base of the bar to the wireway. See Figure 7.
Torque the screws to 1.7 ± 0.2 Nm (15 ± 2 lb in).

Rear of Rack

Wireway Floor Tab
(above bar base sheetmetal)

M4

×

8 Pan-Head Screws

(2 places)

Figure 7. Wireway Tab Attachment

Advertising