Eaton Electrical Powerware BladeUPS Bar User Manual

Page 18

Advertising
background image

INSTALLATION

EATON Powerware

®

BladeUPS

®

Bar Installation Guide

S 164201723 Rev P01

14

19. Using five M4

×8 pan-head screws, install the wireway access

cover. See Figure 9. Torque the screws to 1.7 ± 0.2 Nm
(15 ± 2 lb in).

M4

×

8 Pan-Head Screws

(5 places)

Wireway Access Cover

Figure 9. Wireway Access Cover Installation

20. Verify the six information labels are attached to the wireway as

shown in Figure 10.

Figure 10. Wireway Labels

Advertising